Mercedes W124

since 1985-1995 of release

Repair and car operation



W124 Mercedes
+ Governing bodies and control devices
+ MAINTENANCE
+ 2. Maintenance (diesel engines)
+ ENGINE
+ 4. Repair of 6-cylinder petrol SOHC engines
+ 5. Repair of 6-cylinder petrol DOHC engines
- 6. Repair of the diesel engine established in the car
   6.2. General information
   6.3. Repair operations on the engine established in the car
   6.4. Check of pressure of compression
   6.5. Top dead point (VMT) of the piston of the first cylinder
   6.6. Cover of a head of the block of cylinders
   6.7. Pulley cranked shaft / quencher of krutilny fluctuations and nave
   6.8. Cover of a driving chain
   6.9. Driving chain
   + 6.10. Mechanism of a tension of a driving chain, asterisk and uspokoitel of a chain
   + 6.11. Camshafts and pushers
   6.12. Head of the block of cylinders
   6.13. Oil pallet
   6.14. Oil pump and driving chain
   6.15. Drive flywheel / plate
   6.16. Replacement of sealing rings of a cranked shaft
+ 7. Major maintenance of engines
+ COOLING SYSTEM
+ FUEL SYSTEM
+ 10. System of injection of BOSCH CIS-E fuel (KE-JETRONIC)
+ 11. System of injection of BOSCH HFM fuel
+ 12. Fuel system of diesel engines
+ 13. Fuel system of diesel engines
+ SYSTEMS OF START, IGNITION
+ 15. System of ignition of 4-cylinder petrol engines
+ 16. System of ignition of four-cylinder petrol engines
+ PRESTARTING HEATING
+ TRANSMISSION
+ 19. Mechanical transmission
+ 20. Automatic transmission
+ POWER SHAFTS
+ BRAKE SYSTEM
+ SUSPENSION BRACKET
+ BODY
+ ELECTRIC EQUIPMENT
+ CHECK OF MALFUNCTIONS






6.6. Cover of a head of the block of cylinders

Removal

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Open a cowl and establish it in vertical situation.
3. On engines with a turbonagnetatel remove an air line, a connecting turbonagnetatel with an inlet collector.
4. Weaken a collar and remove a hose of ventilation of a case from a cover of a head of the block of cylinders.
5. Unscrew bolts and uncover heads of the block of cylinders. Remove laying.

Installation

PERFORMANCE ORDER
1. Installation is made in sequence, return to removal. If necessary replace laying of a cover of a head of the block of cylinders.