Mercedes W124

since 1985-1995 of release

Repair and car operation



W124 Mercedes
+ Governing bodies and control devices
+ MAINTENANCE
+ 2. Maintenance (diesel engines)
+ ENGINE
+ 4. Repair of 6-cylinder petrol SOHC engines
+ 5. Repair of 6-cylinder petrol DOHC engines
+ 6. Repair of the diesel engine established in the car
+ 7. Major maintenance of engines
- COOLING SYSTEM
   8.2. General information
   8.3. Hoses of system of cooling
   8.4. Radiator
   8.5. Thermostat
   + 8.6. Radiator fan
   8.7. Electric sensors
   + 8.8. Water pump
   8.9. Heating and ventilation system
   - 8.10. Elements of system of heating
      8.10.2. Heater radiator
      8.10.3. Control panel heater
      8.10.4. Engine of the fan of a heater
      8.10.5. Internal sensor of temperature
      8.10.6. Sensors of temperature of a radiator of a heater
      8.10.7. Switch of distribution of air and cable
      8.10.8. Regulator of size of an air stream
   8.11. Air central air
+ FUEL SYSTEM
+ 10. System of injection of BOSCH CIS-E fuel (KE-JETRONIC)
+ 11. System of injection of BOSCH HFM fuel
+ 12. Fuel system of diesel engines
+ 13. Fuel system of diesel engines
+ SYSTEMS OF START, IGNITION
+ 15. System of ignition of 4-cylinder petrol engines
+ 16. System of ignition of four-cylinder petrol engines
+ PRESTARTING HEATING
+ TRANSMISSION
+ 19. Mechanical transmission
+ 20. Automatic transmission
+ POWER SHAFTS
+ BRAKE SYSTEM
+ SUSPENSION BRACKET
+ BODY
+ ELECTRIC EQUIPMENT
+ CHECK OF MALFUNCTIONS






8.10.3. Control panel heater

Removal

Unscrewing of screws of fastening of the control unit to the control panel

Detachment of the electric socket from a back part of the control unit

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Turn both rotating handles of adjustment to the left against the stop, remove handles and unscrew the opened nuts.
3. Unscrew screws of the bottom fastening of the control panel and remove it.
4. Unscrew screws and take the control unit from the panel and disconnect from a back part of the block electric sockets (see fig. Unscrewing of screws of fastening of the control unit to the control panel, the Detachment of the electric socket from a back part of the control unit).

Installation

PERFORMANCE ORDER
1. Installation is made in sequence, return to removal.