Mercedes W124

since 1985-1995 of release

Repair and car operation



W124 Mercedes
+ Governing bodies and control devices
+ MAINTENANCE
+ 2. Maintenance (diesel engines)
+ ENGINE
+ 4. Repair of 6-cylinder petrol SOHC engines
+ 5. Repair of 6-cylinder petrol DOHC engines
+ 6. Repair of the diesel engine established in the car
+ 7. Major maintenance of engines
+ COOLING SYSTEM
- FUEL SYSTEM
   9.2. General information
   9.3. The air filter and a filtering element
   9.4. The block of adjustment of temperature of air arriving in the engine
   9.5. Fuel pump
   9.6. Fuel level sensor
   9.7. Fuel tank
   9.8. Accelerator cable
   + 9.9. STROMBERG 175 CDT carburetor
   + 9.10. PIERBURG 2E-E carburetor
   9.11. Removal and carburetor installation
   9.12. Inlet collector
   9.13. Heater of an inlet collector
+ 10. System of injection of BOSCH CIS-E fuel (KE-JETRONIC)
+ 11. System of injection of BOSCH HFM fuel
+ 12. Fuel system of diesel engines
+ 13. Fuel system of diesel engines
+ SYSTEMS OF START, IGNITION
+ 15. System of ignition of 4-cylinder petrol engines
+ 16. System of ignition of four-cylinder petrol engines
+ PRESTARTING HEATING
+ TRANSMISSION
+ 19. Mechanical transmission
+ 20. Automatic transmission
+ POWER SHAFTS
+ BRAKE SYSTEM
+ SUSPENSION BRACKET
+ BODY
+ ELECTRIC EQUIPMENT
+ CHECK OF MALFUNCTIONS






9.12. Inlet collector

Removal

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Merge cooling liquid from cooling system.
3. Remove the carburetor.
4. Remove from an inlet collector a vacuum hose of the vacuum amplifier of brakes.
5. Mark and remove from an inlet collector hoses of system of ventilation of a case of an automatic transmission, the central blocking of locks and the valve of system of a retsirkulyatsiya of exhaust gases.
6. Weaken collars and remove hoses of cooling liquid from an inlet collector.
7. Disconnect the electric socket from a heater of an inlet collector, release wires from brackets and move them aside.
8. Unscrew nuts and remove an inlet collector from a head of the block of cylinders. Remove laying.

Installation

PERFORMANCE ORDER
1. Being careful and using a plastic or wooden scraper, clear interfaced surfaces of an inlet collector and a head of the block of cylinders.
2. Establish an inlet collector with new laying on a head of the block of cylinders.
3. Further installation is made in sequence, return to removal taking into account the next moments.
4. Tighten nuts of fastening of an inlet collector the demanded moment.
5. Fill in cooling liquid in cooling system.
6. Connect the electric socket to a heater of an inlet collector.
7. Start the engine, check and, if necessary, adjust turns of idling and the contents WITH in exhaust gases.