Mercedes W124

since 1985-1995 of release

Repair and car operation



W124 Mercedes
+ Governing bodies and control devices
+ MAINTENANCE
+ 2. Maintenance (diesel engines)
+ ENGINE
+ 4. Repair of 6-cylinder petrol SOHC engines
+ 5. Repair of 6-cylinder petrol DOHC engines
+ 6. Repair of the diesel engine established in the car
+ 7. Major maintenance of engines
+ COOLING SYSTEM
- FUEL SYSTEM
   9.2. General information
   9.3. The air filter and a filtering element
   9.4. The block of adjustment of temperature of air arriving in the engine
   9.5. Fuel pump
   9.6. Fuel level sensor
   9.7. Fuel tank
   9.8. Accelerator cable
   - 9.9. STROMBERG 175 CDT carburetor
      9.9.1. Replacement of elements of the carburetor
      9.9.1.2. Jet needle
      9.9.1.3. Delay valve
      9.9.1.4. Diaphragm управленипя zaslonka
   + 9.10. PIERBURG 2E-E carburetor
   9.11. Removal and carburetor installation
   9.12. Inlet collector
   9.13. Heater of an inlet collector
+ 10. System of injection of BOSCH CIS-E fuel (KE-JETRONIC)
+ 11. System of injection of BOSCH HFM fuel
+ 12. Fuel system of diesel engines
+ 13. Fuel system of diesel engines
+ SYSTEMS OF START, IGNITION
+ 15. System of ignition of 4-cylinder petrol engines
+ 16. System of ignition of four-cylinder petrol engines
+ PRESTARTING HEATING
+ TRANSMISSION
+ 19. Mechanical transmission
+ 20. Automatic transmission
+ POWER SHAFTS
+ BRAKE SYSTEM
+ SUSPENSION BRACKET
+ BODY
+ ELECTRIC EQUIPMENT
+ CHECK OF MALFUNCTIONS






9.9.1.3. Delay valve

PERFORMANCE ORDER
1. Check of operability of the valve of a delay make on the cold engine. Include ignition, without starting the engine. From the case of the carburetor disconnect longer vacuum hose and create in it depression. In the first 5-15 seconds through the valve should pass air then the valve should be closed. If air passes through the valve constantly or does not pass absolutely, the valve is faulty and is subject to replacement.
2. Remove the short bent vacuum hose from the valve basis. Disconnect from the valve the electric socket.
3. Unscrew the screw and remove the delay valve from the carburetor.
4. Installation is made in sequence, return to removal.